GL(HCMC)/PCMD/SOP 01
Rev: 00  |  Effective: 15/03/2021
CONTROLLED DOCUMENT

Document Code
Regulations

GAMUDA LAND (HCMC) JSC  ·  PCMD
Prepared byAw Soon Heng — Head of PCMD
Approved byLiew Bing Fooi — General Director
ScopeAll PCMD Projects
ReferenceISO 9001:2015

Syntax — Submission & Issued Documents

A₁A₁.A₂.A₃A₃ / BBB / CCC / DD / EEE / FFF
A₁A₁.A₂.A₃A₃Project name abbreviation
BBBOrganization issuing the document
CCCDocument category
DDWork package
EEEOrdinal number of the document
FFFAbbreviation of Revision
Project Name (A₁A₁ · A₂ · A₃A₃)
CodeMeaningNote
A₁A₁ — Project Name
A5Plot A5e.g. "A5" = Plot A5
A₂ — Phase
2Phase 2Numeric
A₃A₃ — Package Name
MBMain Building Works
ESPWEarth, Piling & Substructure Works
IDInterior Decoration Works
SIGNSignage Works
Organization (BBB)
CodeOrganization
HBCHoa Binh Corporation
RICONSRicons
FCSFecon South
Document Category (CCC)
CodeCategory
SOPSubmission of plan
MASMaterial Submission
SDSShop Drawing Submission
MSSMethod Statement Submission
OTSOther Submission
RFIRequest for Information
VONVariation Order Notice
RFVRequest for Variation Order
SINSite Instruction
NCRNon-Conformance Report
CTRConstruction Report
DFLDefect List
QLRQuality Report
SNCSite Notification
SMMSite Memo
NODNotice of Delay
SRCSite Record
PNNPenalty Notice
DLPDefect Liability Period
RFARequest for Approval
Work Package (DD)
CodePackage
INInfra
STStructure
ARArchitecture
LSLandscape
MEMechanical, Electrical System
PSPlumbing & Sanitary System
SWSwimming Pool & Water Feature System
LFLift System
TelTelecom System
Example
A5.2.MB / RICONS / MAS / AR / 001 / R01
Material submission of Architect No. 001 Revision 01 by Ricons contractor, for Main Building Works at project Plot A5 – Phase 2.

Syntax — Installation Inspection Acceptance Minutes

A₁A₁.A₂.A₃A₃.A₄A₄ / BBB / CCC / DDD / EE . FFF
A₃A₃Location (BA/BB/ED/V1…)
A₄A₄Package name
CCCAcceptance minutes category
DDDInspection item category
EEArea of inspection item
FFFOrdinal number
Location (A₃A₃)
CodeLocation
BABlock A
BBBlock B
EDE-deck
V1Villa 01
Acceptance Minutes Category (CCC)
CodeCategory
CSIConstruction Stage Inspection (Topping out, completion)
CWIConstruction Work Inspection (Daily inspection)
QLIQuality Inspection
ILFInspection of Lift Works
IMEInspection of ME Works
IPSInspection of PS Works
ISWInspection of Swimming Pool & Water Feature Work
ITelInspection of Telecom System Work
T&CTesting and Commissioning
Inspection Item — DDD (Foundation)
CodeItem
FECExcavation Works
FBFBack Filling and Compaction Works
FPPPlatform Preparation Works
FPLPile Location Works
FPIPile Installation Works
FCRConcrete Casting or Pre-cast Pile
FSISoil Investigation
FATAnti-Termite
Inspection Item — DDD (Structure)
CodeItem
SFWFormwork
SREReinforcement
SCRConcrete
SSSSteel Structure (Erection)
SPCPost Concrete (After Stripping Formwork)
Inspection Item — DDD (Architecture)
CodeItemCodeItem
ASWSurvey WorksAADAluminum Door & Window
ABWBrick WorksAMDMetal Door Works
APWPlastering WorksASNSignage
ASCSkim Coat WorksAKCKitchen Cabinet
APAPainting WorksAWAWardrobe
AWPWater ProofingACACarpentry Works
AFSFloor ScreedingAALAluminum Works
ATSTiling and StoneAGYGypsum Ceiling
ATFTimber FloorAMTMetal Works
ATDTimber Door WorksASFSanitary Ware & Fitting
AHRHandrail Works
Area of Inspection Item (EE)
CodeArea
BMBasement
F1Floor 1 (Fn = Floor n)
TRTerrace
RFRoof Top
Example
A5.2.BA.MB / RICONS / CWI / ABW / F5.002
Inspection acceptance minutes No. 002 for brick work at 5th floor by Ricons contractor for Main Building Works, project Plot A5 – Phase 2 – Block A.

Syntax — Material Inspection Acceptance Minutes

A₁A₁.A₂.A₃A₃ / BBB / CCC / DD / EE / FFF
Acceptance Minutes Category (CCC)
CodeCategory
FAIFabrication Inspection
MRIMaterial Inspection
Inspection Item (EE) — Materials
CodeMaterialCodeMaterial
RERebarTDTimber Door
CPCouplerMDMetal Door
SASteel AngleADAluminum Door + Window
BOBoltLOLouver
SASandRARailing
RORockDADoor Accessory
CECementTCTimber Cabinet
BRBrickTSTimber Skirting
WPWater ProofingSWSanitary Ware & Fitting
TITileSSShower Screen & Accessory
STStoneMRMirror
GCGypsum CeilingGLGlass
PAPaintGBGlass Balustrade
EJExpansion Joint Cover PlateATAnti-Termite
Example
A5.2.MB / RICONS / MRI / AR / TI / 001
Architect inspection acceptance minutes No. 1 for tile material by Ricons contractor, Main Building Works at project Plot A5 – Phase 2.

Syntax — Drawing Number

A₁A₁.A₂.A₃A₃.A₄A₄ / BBB / CC / DD / EE / FF / GGG / H
CCStage and status of drawing
DDWork package
EEWork item
FFArea of inspection item
GGGDrawing number
HDrawing revision number
Stage & Status of Drawing (CC)
CodeStage
CCConcept Design
SCSchematic Design
DDDevelopment Drawing
TDTender Drawing
CDConstruction Drawing
SDShop Drawing
ABAs-Built Drawing
Work Item (EE) — Architecture
CodeItemCodeItem
ACArchitecture CoordinateDWDoor and Window
WAWall and ColumnWPWater Proofing
CECeilingSISignage
FLFloorOTOthers
STStaircase, RailingLBLobby
Work Item (EE) — MEP
CodeSystemCodeSystem
LNLightning SystemFAFire Alarm System
LVElectrical SchematicFPFire Protection System
LTLighting SystemCOCO Sensor System
TTLTray, Trunking InstallationSLSleeves and Opening
MSBMain Switch BoardACAir-Conditioning & Ventilation
CWWater Supply SystemRWRain Water System
WWWaste Water SystemLFILift Installation
Example
A5.2.BA.MB / RICONS / AB / AR / WA / F4 / 001 / R01
Architect As-Built Drawing No. 001 Revision 1 of Wall and Column by Ricons contractor, Main Building Works at 4th floor Block A – Phase 2 – Plot A5.
🔍
CodeDescriptionCategory